亚洲一区二区三区含羞草_国产精品一区二区三区四区五区_一级特黄色_欧美乱强伦xxxxx高潮_狠狠操伊人_日日干日日_色四月_日韩av手机在线观看_国产精品无码免费视频二三区_av影视在线

To become world-class integrated energy
and environmental solutions provider
ABOUT ZHGAS Development History Accreditations & Honors Organizational Structure Corporate Culture Brochures Company video
Company History
Company History
Steady Growth & Solid Foundations
2016: Established in Anhui Chaohu Economic Development Zone
2017: Founded Beijing Design Institute
Obtained full engineering qualifications: chemical industry design, solid waste treatment, EPC contracting, pressure pipeline design, etc.
Built comprehensive patent portfolio for core technologies
2023: Relocated to integrated R&D-production center
History
Industry-Academia-Research Integration
2016: Signed R&D agreement with CAS Institute of Engineering Thermophysics
2017: CGAS technology selected for CAS "Hongguang Special Project"
2020: Co-established CAS Coal Clean Combustion & Gasification Lab
2022: Won Shandong's "Unveiling & Commanding" key tech project
2022: Atmospheric O?-enriched CFB tech certified by China Petroleum and Chemical Industry Federation
2022: CGAS listed on MEE's (Ministry of Ecology and Environment) achievement transformation platform
2024-2025: CGAS included in MIIT's energy-saving/advanced technology catalogs
History
Sustainable Coal Gasification Business
2017: Launched as CAS CGAS industrialization platform
2018:First overseas project: Indonesia Xiangsheng
2019: Implemented Projects at Xinjiang Yihua, Jiangsu Delong, etc.
2021: Verified long-term stability at Xiangsheng/Yihua plants
2022: Breakthrough projects including East Hope Sanmenxia
2023:First pure oxygen CFB project (Shandong Rongxin),Multi-project signings across 6 provinces
2024: New projects (Zhanhua Phase II, Xinjiang Huineng, etc.)
History
Advancing Biomass Business
Conducted pilot tests for agricultural/forestry/urban waste biomass
Developed two gasification technologies:Air/O?-enriched gasification for industrial fuel gas,Pure O?-enriched gasification for green methanol/chemicals
Engineered low-calorific biomass incinerators
Completed process package design and development
Partnered with Shandong Rongxin & CAS for biomass- pulverized coal co-gasification
Secured first industrial demonstration project
History
Pioneering Environmental Solutions
Implemented 100+ environmental upgrades (fixed-bed intercooling, ammonia stripping) for clients like Jinneng Group, purifying 25M Nm³/day
Gasification ash/slag treatment:Operational: Linzhou Fengbao CFB ash/slag carbon combustion
Gasification ash/slag treatment:Under construction: Shandong Rongxin ash/slag melting gasification
Expanded to entrained-flow bed ash/slag disposal : Xinjiang Tianye project
Sludge solutions:Delivered first sludge carbonization project (Qixian)
Sludge solutions:Developed sludge incineration technologies
History
Innovative O&M Model
Established professional O&M team for asset-light expansion
First sludge O&M contract: Zigui WWTP ( Wastewater Treatment Plant) carbonization
Optimized gasifiers for Linzhou Fengbao, Huiran Industry, etc. through:Customized design,Phased data analysis and predictive adjustments,On-site training
New revenue stream: Xinjiang Xinli activated carbon O&M
History
Self-Sufficient Manufacturing
2022: Production base launched for CFB gasifier & environmental equipmen
Obtained LV switchgear production certification
Annual capacity:10,000+ tons non-standard equipment
Annual capacity:600+ switchgear cabinets
History
Steady Growth & Solid Foundations
Industry-Academia-Research Integration
Sustainable Coal Gasification Business
Advancing Biomass Business
Pioneering Environmental Solutions
Innovative O&M Model
Self-Sufficient Manufacturing
010-6252 0420
主站蜘蛛池模板: 土默特左旗| 台湾省| 行唐县| 襄垣县| 慈溪市| 博爱县| 东乡县| 青浦区| 罗城| 虎林市| 仙桃市| 台江县| 宝兴县| 东台市| 沭阳县| 龙江县| 玛曲县| 拉萨市| 呼伦贝尔市| 汉沽区| 南木林县| 临汾市| 商南县| 怀仁县| 天等县| 阳高县| 莫力| 罗源县| 确山县| 锦屏县| 平阴县| 秭归县| 青岛市| 柯坪县| 水富县| 宁明县| 阿坝| 满洲里市| 德格县| 安岳县| 荔浦县|